Explore our power lines, substations, and distribution projects.
Distribution
September 19, 2025
YESC Distribution Line Project (2024–25): Multi-Township Upgrades Across Yangon for 24/7 Power
The YESC distribution line project (2024–25) upgraded 0.4–33 kV networks, transformers, VCB panels and underground cables across Yangon in 165 days.
Distribution
September 19, 2025
Hsihseng 33 kV Line Project: Turnkey Installation from Hsihseng to Naung Yindong
The Hsihseng 33 kV line project delivered a turnkey line to Naung Yindong in 180 days, strengthening reliable electricity distribution in Shan (South).
Substation
September 19, 2025
Pathein 66 kV Line Project: Turnkey Installation from 230 kV Kan Kone Main Substation
The Pathein 66 kV line project delivered a turnkey feeder from the 230 kV Kan Kone main substation in 180 days, strengthening power for Pathein.
Distribution
September 19, 2025
Waw 33 kV Line Project: ACSR 477 MCM Turnkey Upgrade Strengthens Bago (East)
The Waw 33 kV line project upgraded Bago (East) with ACSR 477 MCM on a turnkey basis in 180 days, boosting reliable electricity distribution.
Substation
September 19, 2025
Danubyu 33 kV Line Project: ACSR 477 MCM Turnkey Installation Strengthens Ayeyarwady Supply
The Danubyu 33 kV line project upgraded the Yekyi–Danubyu corridor with ACSR 477 MCM on a turnkey basis in 180 days, boosting grid reliability.
Substation
September 19, 2025
Kyaikto 33 kV Line Project (AW/OC): Dedicated Feeder Delivered to Kyaiktiyo Pagoda & Cable Car Substations
The Kyaikto 33 kV line project delivered a turnkey AW/OC dedicated feeder in 180 days, strengthening supply to Kyaiktiyo Pagoda and Cable Car substations.
Distribution
September 19, 2025
Shan South Rural Electrification: 11 kV Lines & Transformers Delivered Across Pinlaung, Naungtayar, and Tigyit
Shan South rural electrification delivered 11 kV lines and transformers in Pinlaung, Naungtayar, and Tigyit in 365 days, boosting reliable village power.
Distribution
September 19, 2025
Pyigyidagon 66 kV Line Phase 2: 22 m Concrete Pole Installation (70 Nos) Completed
The Pyigyidagon 66 kV line project (Phase 2) installed seventy 22 m concrete poles in 120 days, strengthening electricity distribution in Mandalay.
Substation
September 19, 2025
Yamethin Substation Upgrade: 33/11 kV, 10 MVA Transformation at Ywar Tan Completed
The Yamethin substation upgrade at Ywar Tan replaced (2.5+1.5) MVA with a 10 MVA transformer in 180 days, improving electricity supply in Myanmar.
Substation
September 11, 2025
Bago City Electricity Network Improved with New 66/11 kV, 20 MVA Substation
Completion of a new power substation in Bago improves electricity supply in Myanmar, delivering reliable energy for residents and businesses.