Ayeyarwady Distribution Line Project — Delivering Reliable Power for Ayeyarwady(Kangyi Daunt Township)

Kangyi Daunt Tsp, Ayeyarwaddy

December 18, 2025

Ayeyarwady Distribution Line Project — Delivering Reliable Power for Ayeyarwady

The Ayeyarwady distribution line project (2024–2026) is a regional program delivered by Yaung Ni Oo Electric to modernize low- and medium-voltage networks. Under Ayeyarwady Region Government funding, the works improve safety, expand capacity, and cut interruptions so townships can access dependable, 24-hour power. 

Geographic Coverage & Phasing

2024–2025: Village/ward electrification and feeder upgrades in Kyaunggon, Yekyi, Hinthada, Ngapudaw, Shwethaungyan, Pathein.
2025–2026: Continued rollout in Pathein, Myaungmya, Danubyu, Zalun, Kangyidaunt, Yekyi, Ngapudaw, Dedaye, reinforcing corridors serving housing estates, markets, schools, and clinics.

Planning, Schedule & HSE (120 Days / 960 Hours per Package)

Each package was sequenced around the rainy season to maintain access and quality. Multidisciplinary teams handled survey, civil, electrical, logistics, and HSE; long-lead items (conductors, poles, transformers, switchgear) were staged early. Daily toolbox talks, permit-to-work routines, energized-network proximity procedures, and traffic management kept crews and communities safe.

Turnkey Scope & Technical Works

Delivered on a full turnkey basis—survey, design, procurement, construction, testing, commissioning:

Challenges & Mitigations (Monsoon, Access, Logistics)

Delta soils and seasonal rain affected foundations and transport. The team mitigated by re-sequencing foundations/stringing to weather windows, using temporary access pads and barricades near public routes, coordinating deliveries to keep continuous work fronts, and enforcing work-at-height and live-network controls.

Outcomes & Community Benefits

Handover & Compliance

All completed packages were tested, commissioned, and handed over to the Ayeyarwady Electricity Supply Department with full documentation. Materials and workmanship complied with national and international quality standards, ensuring durable performance for electricity distribution Ayeyarwady.

See more Ayeyarwady works on the Projects page.

International Electrotechnical Commission — IEC guidance on distribution line clearances and MV switchgear.

About Yaung Ni Oo Electric

Yaung Ni Oo Electric Co., Ltd. is a subsidiary of Yaung Ni Oo Group, focused on advancing Myanmar’s power infrastructure. With a strong track record in government and community projects, the company specializes in power distribution, electrification, and infrastructure development that align with both national and international standards.

Driven by its commitment to reliability and safety, Yaung Ni Oo Electric supports sustainable growth by delivering uninterrupted power supply solutions to residential, commercial, and public sectors. With skilled engineers, modern equipment, and efficient project management, the company plays a vital role in strengthening Myanmar’s energy future. Learn More

General Inquires

Call: +95 9 42574 9399
Address: No 26 Aye Yeik Mon Main Rd, Yangon, Myanmar (Burma)
Office Hours: 9am to 5pm (Mon- Sat)

Contact information

Please feel free to reach out to our office for any business inquires.

Name *
Ph.No *
Company Name (optional)
Message *