110V Battery Bank and charger Installation- Bilin Township

110V Battery Bank and charger Installation was executed to provide a robust, dedicated feeder that improves voltage stability and reduces interruptions across Mawlamyine Township in Mon State. . Delivering a dedicated feeder isolates critical loads from upstream disturbances, improving reliability while enabling future load growth.

Planning, Schedule, and Risk Controls

The project achieved completion in 202 calendar days and 1616 total work hours

These controls ensured the 110V Battery Bank and Charger Installation hit time, cost, and quality targets without compromising HSE (health, safety, environment) standards.

Turnkey Scope & Technical Works

Executed as a full turnkey EPC, the scope covered end-to-end activities:

  1. Survey & Design


  2. Material Transport

  3. Installation

  4. Testing & Commissioning
    Mechanical completion, punch-list clearance, insulation resistance checks, line patrolling, sectional energization, and as-built documentation.

All materials and workmanship complied with national and international quality standards, assuring long-term performance and maintainability for the electricity distribution in Myanmar grid.

 

These improvements ripple outward—better reliability for local businesses, accommodation, and transport, and a more stable platform for future electrification initiatives.

Health, Safety, and Environmental (HSE) Performance

Construction adjacent to public roads and pilgrimage routes required stringent HSE measures: traffic coordination during stringing, barricading around foundation works, fall-protection for work-at-height, and live-network proximity procedures. Daily HSE briefings and documented permits-to-work underpinned safe execution throughout this project.

Outcomes and Handover

With testing and commissioning complete, the line entered service on schedule. The utility received a full handover package—test reports, material certificates, relay settings, and as-built drawings—supporting smooth operations and lifecycle maintenance.

Community and system benefits:

Explore additional powerline works on the Projects page.

See IEC distribution and overhead line guidance for conductor stringing, clearances, and insulation (International Electrotechnical Commission).

About Yaung Ni Oo Electric

Yaung Ni Oo Electric Co., Ltd. is a subsidiary of Yaung Ni Oo Group, focused on advancing Myanmar’s power infrastructure. With a strong track record in government and community projects, the company specializes in power distribution, electrification, and infrastructure development that align with both national and international standards.

Driven by its commitment to reliability and safety, Yaung Ni Oo Electric supports sustainable growth by delivering uninterrupted power supply solutions to residential, commercial, and public sectors. With skilled engineers, modern equipment, and efficient project management, the company plays a vital role in strengthening Myanmar’s energy future. Learn More

General Inquires

Call: +95 9 42574 9399
Address: No 26 Aye Yeik Mon Main Rd, Yangon, Myanmar (Burma)
Office Hours: 9am to 5pm (Mon- Sat)

Contact information

Please feel free to reach out to our office for any business inquires.

Name *
Ph.No *
Company Name (optional)
Message *