YESC Distribution Line Project — Delivering Reliable Power for Yangon

The YESC distribution line project for FY 2024–25 modernized medium- and low-voltage networks across multiple Yangon townships. Funded by the Yangon Region Government, the works expanded capacity, improved safety, and reduced interruptions on feeders serving dense residential and commercial zones. The program delivered overhead and underground cable assets, new transformers, and 12 kV VCB panels, all aimed at 24-hour reliable supply.

Where the Works Happened

Target townships included Dagon (South), Taikkyi, Thaketa, Insein, Shwepyithar, Thanlyin, Hlegu, and Hlegu (Faunggyi). Packages were prioritized for outage-prone corridors, new housing estates, markets, schools, and clinics—boosting resilience where demand is rising fastest.

Turnkey Scope & Deliverables

Executed on a full turnkey basis—survey, design, procurement, construction, testing, and commissioning—the program included:

Planning, Schedule, and Risk Management

Completion in 165 days (1,320 hours) required meticulous staging. Before mobilization, multidisciplinary teams were deployed, long-lead equipment was secured, and rainy-season calendars were baked into the schedule. Daily toolbox talks, permit-to-work routines, and proximity procedures near energized assets kept crews safe while maintaining productivity in congested streets.

What Changed on the Ground

Upgrades under the YESC distribution line project delivered tangible improvements:

Handover and Compliance

All packages were tested, commissioned, and formally handed over to Yangon Electricity Supply Corporation (YESC) with as-built drawings, test reports, and O&M guidance. Materials and workmanship conformed to national and international quality standards, ensuring durable performance for electricity distribution in Yangon.

Community Impact

Residents and businesses across the listed townships now benefit from:

See more Yangon works on the Projects page.

International Electrotechnical Commission — IEC guidance on distribution line clearances and MV switchgear.

About Yaung Ni Oo Electric

Yaung Ni Oo Electric Co., Ltd. is a subsidiary of Yaung Ni Oo Group, focused on advancing Myanmar’s power infrastructure. With a strong track record in government and community projects, the company specializes in power distribution, electrification, and infrastructure development that align with both national and international standards.

Driven by its commitment to reliability and safety, Yaung Ni Oo Electric supports sustainable growth by delivering uninterrupted power supply solutions to residential, commercial, and public sectors. With skilled engineers, modern equipment, and efficient project management, the company plays a vital role in strengthening Myanmar’s energy future. Learn More

General Inquires

Call: +95 9 42574 9399
Address: No 26 Aye Yeik Mon Main Rd, Yangon, Myanmar (Burma)
Office Hours: 9am to 5pm (Mon- Sat)

Contact information

Please feel free to reach out to our office for any business inquires.

Name *
Ph.No *
Company Name (optional)
Message *