(Hlawgar – Thaketa) – Mingalardon 230kV Power Transmission Line

The Goal

To Install 230kV Transmission Line between 230KV Hlawgar – Thaketa Transmission Line and 230kV Mingalardon Substation

days
0
man hours
0

Location

Mingalardon (Zaykabar Compound)

What we did

Tower Erection, Stringing & Fitting accessories installation of Mono Pole Tower, DTTE (30-60), DTTE (60-90).

End Results

The project has done as expected of target date and cost along with project scope, though project hide a lot of unforeseen risk , project team has overcome the impact of risk by the effective mitigation plan thoroughly managed as well as monitoring the cost effectively based on project budgeted plan, therefore project result has come out within budgeted cost frame. The quality comes out the needed quality to hit the target of international standard as given time frame.

Do you have a project for us?

We would love to chat with you. Ask us anything!